Battery Commissioning

 Proper commissioning of the DC battery system is essential for proper operation of the battery and for establishing baseline data. This baseline data is critical for follow-on trend analysis and for warranty related issues.

All of our commissioning procedures follow all applicable IEEE standards and include:

  • Thorough visual inspection
  • Measure and record battery temperature
  • Measure and record overall voltage
  • Measure and record individual jar\cell voltages
  • Measure and record internal jar\cell resistance
  • Measure and record intercell\interjar resistance
  • Measure and record specific gravity (if applicable)
  • Check electrolyte levels and fill (if applicable)
  • Clean and neutralize any electrolyte on battery covers or racks
  • Wipe off dust and debris to eliminate parasitic paths for conduction
  • Perform acceptance capacity (load) testing of the battery

Upon completion of our commissioning procedures, we provide a detailed maintenance report that includes procedures, conclusions and recommendations.

© Copyright - API Battery
WP-Backgrounds by InoPlugs Web Design and Juwelier Schönmann